
Swimming pool contractors across Metro Manila
The ground changes every few kilometres in this metro, and a pool has to be engineered for the ground it sits on. Here is what each city does to a swimming pool, and what we have already built there.
Based in Las Piñas, working across the metro
Our yard has been in Talon I since 1989. We take work across Metro Manila and the surrounding Luzon provinces, and project-based work nationwide for resort and developer clients.

Las Piñas
Based in Talon I since 1989. Low-lying ground makes hydrostatic detailing structural here, not optional.
See the area →
Parañaque
Reclaimed and filled land near the bay changes the reinforcement schedule, and salt air changes the specification.
See the area →
Makati
Podium and rooftop pools coordinated with the building's structural engineer, on sites with nowhere to stage materials.
See the area →
Taguig and BGC
Penthouse pools and architectural water curtains, delivered for Megaworld at St. Moritz Private Estate.
See the area →
Pasay
Roof deck lap pool, kiddie pool, and outdoor jacuzzis for Megaworld, built for hotel bathing loads.
See the area →
Quezon City
Higher ground than the bay cities, but decades-old waterproofing and undersized filtration reaching end of life.
See the area →
Muntinlupa and Alabang
Larger lots and rolling terrain, which is what makes a genuine vanishing edge possible.
See the area →Why the city on the address changes the build
Water table
Ground water sits close to the surface in the bay cities and lower on higher ground to the north. It decides whether hydrostatic relief is essential or merely sensible.
Ground condition
Reclaimed and filled land behaves differently from natural ground, so the soil report drives the reinforcement schedule rather than a standard detail.
Site access
A subdivision lot takes deliveries at the gate. A CBD tower takes them by hoist, to somebody else's schedule, with nowhere to stage anything.
What sits below
A ground-level pool leaks into soil. An elevated pool leaks into apartments, which is why waterproofing carries a different weight in Makati than in Las Piñas.
Whichever contractor you speak to, ask what they know about the ground at your specific address and how it changed their approach. A quote that would be identical on a reclaimed parcel in Parañaque and a hillside in Alabang has not accounted for either.
Building or repairing a pool here? Talk to the engineering team.
Send the site location and what you have in mind. We will come back with a technical assessment and a costed proposal.